Works
Urban development of Sector BZ of the Zona Franca in Barcelona
Structures of the new C-51 highway at Valls
Structures of the new C-51 highway, the Vendrell- Valls. Completely finalised
Construction of the Garrigues – Segarra irrigation channel
Construction of the stations of the new metro
Line 9
Construction of the new Metro Line 9, Buen Pastor stretch
Construction of Number 9 shaft of Line 9 of the Barcelona metro
Exterior urban development of the accesses to the stations of the Barcelona metro Line 9
Construction of the new Metro Line 9, airport stretch
Paving with machine for large-size pieces (up to 450 Kg)